A new option has been introduced to give you greater control over the selection priority for surfaces and quilts. You can now choose between the previous selection order or prioritize quilts over surfaces.

If you often need to select quilts for more stable references during regeneration, this option can help reduce the number of clicks required and lower the chances of selecting a surface instead of a quilt.

Activate the option Prioritize quilts over surface to set a higher selection priority for quilts. When using workflows like Pick From List, the Quilt object will be listed before the nearest corresponding surface at the pick point.

Benefits:

  • Simplified workflows for selecting stable quilt references.
  • Fewer clicks needed to select quilts.
  • Decreased likelihood of selecting a surface instead of a quilt when the quilt consists of a single surface.

Creo Parametric 11.0.0.0

User Interface Location: Click File >  Options > Global > Selection > Selection Priority.

For more information, Follow this link.

Subscribe to this blog for a daily dose of Creo Tips (Add your email address in the subscribe button available at the top of this page).