This is a post on the 3Hit Site.
According to a recent study by PTC, 37.9% of engineers experienced dramatic or multiple last-minute changes working on a recent project. That means over one-third of engineers require extensive “design agility” as part of their modeling process.
“Design Agility” is the quickness, ease and flexibility one has to have in order to make changes in CAD files to either create multiple ideas in the design stage or refine ideas downstream.
The survey also revealed that:
Leave a Reply